They're in my future as well ... planned for this fall. It will require drilling out the current rivets and then re-rivetting with cherry max rivets under the watchful eye of my mech...at the same time I am planning to replace my 20 amp generator with a 50-amp operator, add shoulder belts and VGs, all pending the ability to get the time away from work, and availability of dollars.